Omniplex Sunderland
Omniplex transformed this cinema into a premium 5 star experience with luxury seating and bespoke cocktail and beer offerings. SCC acted as MEP consultants, delivering designs that supported a high quality refurbishment and enhanced customer experience.
The Printworks
Commercial office fit out at The Print Works in Belfast city centre. Working with Johnston Houston, part of Drees and Sommer, SCC delivered MEP design and site services for this Victorian building, featuring media walls, kitchens, agile spaces and meeting rooms.
Ibis Coleraine
Belfast Harlequins
SCC delivered design for full pitch lighting replacement and LV distribution upgrade. Existing columns were retained with new LED floodlighting installed. A strong collaboration alongside Wayne Storey, Abax and NMK Engineering ensured a high quality outcome.
Progressive Newtownards
SCC provided full M&E design focused on energy efficiency, comfort and future ready systems. Works included intelligent lighting, upgraded HVAC and robust power and data infrastructure, all tailored to meet the needs of a modern commercial environment.
The Printworks
Commercial office fit out at The Print Works in Belfast city centre. SCC delivered MEP design and site services, supporting a high quality refurbishment alongside Johnston Houston and Somerville Fit Out, creating flexible and modern working spaces.
Ibis Coleraine
Three storey hotel refurbishment to IBIS standards, including bedrooms, reception and corridors. Works included full electrical fit out, upgraded ventilation systems, replacement sanitaryware and improved plumbing infrastructure.
Boojum
SCC delivered full MEP design across multiple Boojum sites including restaurants and central kitchens. Works covered ventilation, lighting, heating, plumbing, drainage, power, data, fire alarm and security systems, ensuring quality and coordination throughout.
Alexandra College
Dublin city centre school canteen extension and upgrade including new kitchen and servery fit out. Works also included flexible dining areas, new air handling systems, ductwork and a complete air conditioning installation.
Antrim Tech Park
Following major flood damage, SCC supported a full refurbishment for a leading Northern Ireland utility provider. Works included replacement of all M&E services and delivery of a modern CAT A and CAT B collaborative workspace.
Kainos Belfast
SCC supported the expansion of Kainos Belfast HQ into the Bank of Ireland building, delivering collaborative spaces, breakout areas and meeting rooms. The project included exposed MEP services and required careful coordination to minimise disruption.
Kainos Belfast
SCC delivered the extension of Kainos Belfast headquarters, creating flexible workspaces and collaborative zones. The project featured energy efficient lighting, advanced HVAC systems and seamless connectivity, ensuring a high performing workplace.
DHL Dublin
Full M&E fit out of toilets, boardroom, meeting rooms, IT and comms rooms. Open plan areas were designed with integrated lighting, heating, cooling and fresh air systems to support a flexible and efficient working environment.
35DP
Major refurbishment of the Boots Building in Belfast including full renewal of all MEP systems. SCC was involved from Stage 1 through to handover, overcoming complex distribution challenges through detailed design and BIM coordination.
Margot
Full MEP design for a listed building in Belfast city centre, transforming basement and ground floors into bar and restaurant spaces. Design carefully protected heritage features while integrating modern systems and flexible lighting controls.
Margot
Full MEP design for a listed Belfast building, delivering a bar and restaurant fit out with minimal impact on heritage features. Systems included concealed HVAC, bespoke lighting design and coordinated services for a high quality finish.
Margot
Full MEP design for a listed Belfast property, balancing heritage preservation with modern functionality. Works included advanced HVAC systems, integrated lighting and close collaboration with the wider design team.
Char & Mash
Full M&E bar and restaurant fit out within Odyssey Arena units. Works included ventilation, air conditioning and feature lighting across a 15,000 sq ft space with multiple zones including dining areas, terrace and VIP spaces.
Char & Mash
Full M&E bar and restaurant fit out at Odyssey Arena including ventilation, air conditioning and lighting design. The 15,000 sq ft venue features multiple distinct zones, delivering an immersive and high quality guest experience.
The Ewart 10
SCC delivered full MEP design from RIBA Stage 2 to completion, using Revit for coordinated technical design. Works were carefully planned to minimise disruption as the building remained occupied throughout construction.
The Ewart 10
SCC provided full MEP design from RIBA Stage 2 through completion, delivering coordinated technical solutions using Revit. Construction was managed carefully to ensure minimal disruption to existing building occupants.
Custom house
SCC delivered full MEP design from feasibility through to completion, targeting WELL Platinum standards. Works included enhanced ventilation, advanced lighting and exposed services, supporting a high quality and sustainable refurbishment.
Larne Point of Entry
Commissioning management for three new Port of Entry buildings in Larne. SCC managed commissioning processes, validating systems and ensuring performance across all building services alongside the main contractor and specialist teams.
York Apartments
High end apartment development in Portstewart delivering 10 units. Works included integration of solar roof tiles providing individual electrical generation, supporting sustainability and modern residential design standards.
Margot
Refurbishment of Margot Bar and Rudi Nightclub within a Grade A listed Georgian building in Belfast. Works included restoration and full bar fit out across ground and lower ground levels.
Conor House
Air conditioning replacement for a three storey office building in Belfast. Works included new internal and external units, system rewiring and upgraded controls to improve efficiency and performance.
Larne Point of Entry
Commissioning management for three new Port of Entry buildings in Larne, overseeing system validation and ensuring all building services were fully tested and operational to required standards.
Our process is simple and only contains a few simple steps

Consultation

Assessment

Solution Design

Documentation

Delivery Support
operating HOURS
Mon: 8:00AM - 5:30PM
Tue: 8:00AM - 5:30PM
Wed: 8:00AM - 5:30PM
Thu: 8:00AM - 5:30PM
Fri: 8:00AM - 5:30PM
Sat: Closed
Sun: Closed